Artisan Well Connection and Installation Environment Plan
To help meet east coast domestic energy demand, subsea gas reserves need to be developed to replace existing wells as they run out. Imported alternatives cost more and result in higher emissions. Amplitude Energy recently announced the conditional purchase of a 50% operating interest in the Artisan field. This will allow for more efficient development of the field with a smaller environmental footprint by leveraging Amplitude Energy's existing infrastructure.
Announcement: Purchase of Artisan gas field from Beach Energy
To enable this, Amplitude Energy will prepare plans to incorporate the Artisan gas field development into our East Coast Supply Project (ECSP). We will develop 2 environment plans (EPs) to cover:
- the suspended Artisan-1 well - the well was originally drilled in 2021, “completed” (prepared for production) in 2026 and long term suspended – "long term suspended well” in this instance means all well construction has been completed and the well has been left in a safe state for future production.
- the offshore connection of the Artisan-1 well to our existing CHN pipeline.
This webpage considers the second of these two related EPs, the Artisan Well Connection and Installation EP, which covers activities necessary for installing, testing and maintaining the flowlines and ancillary infrastructure that will connect the Artisan-1 well to the existing CHN pipeline.
Location
Approximately 20-30 km offshore Peterborough, Victoria
Offshore Eastern Maar Country
Update log
- August 2026: Page created
Call for comments
We are preparing the Artisan Well Connection and Installation Environment Plan. If you think your functions, interests or activities may be affected, we would like to hear from you.
| WEBINARS - We invite you to register via email if you would like to attend one of the following webinars where you can interactively engage with us on these activities. |
|---|
| Please register by 14 September 2026 via stakeholder@amplitudeenergy.com.au |
| Tuesday 15 September 2026 2:00pm EST |
| Thursday 15 September 2026 7:00pm EST |
| Thursday 17 September 2026 2:00pm EST |
| Thursday 17 September 2026 7:00pm EST |
Activity details include the following:
Well connection vessel-based activities using 1-2 work vessels:
- Pre and post lay activities
- Install flowlines and umbilicals
- Flowline and umbilical connection to Artisan well
- System testing and preservation
Inspection, maintenance and repair (IMR) and Survey
- Inspections, maintenance and repair (IMR) of flowlines and umbilicals using vessels and ROVs
- Survey may include sub bottom profiler, side scan sonar, multi-beam echosounder and magnetometer, and geotechnical equipment for shallow seabed sampling.
- Vessel operations: Generally one specialised work vessel equipped with dynamic positioning systems, cranes, remotely operated vehicle and/or diving equipment.
Distance from shore
Approximately 20 to 30 km
Permit areas
Commonwealth: VIC/L35, VIC/P76, VIC/L24, VIC/PL37
Water depth
Approximately 60 m to 70 m
Supply base
To be determined.
Summary of Impacts, Risks and Activities
See below and in this information sheet regarding impacts, risks and control measures.
Timeline
The EP covers a 4-year period from 2027 to 2030. This window includes for the installation activity of approximately 35 to 40 days, as well as a number of inspection only, or inspection, maintenance and repair (IMR) campaigns with durations generally of 2 days, and up to 4 weeks if repairs are required.
Identified impacts and risks
By interest group
If you have concerns about how these may affect your functions, interests or activities, please contact us.
Find out about risks and impacts that may affect you.
Interaction with other marine users
- Other marine users will be requested to maintain a safe distance of 500m from operating work vessels
- The Artisan-1 well has a 500m Petroleum Safety Zone (PSZ) - A719967.pdf
Impacts
- Changes to the functions, interests and activities of other marine users
Controls
- Temporary Exclusion Zones will be communicated via Notices to Mariners
- Artisan-1 PSZ
- Fisheries damages protocol
- Ongoing consultation and notification
- Marine assurance process
Seabed disturbance
Our proposed activities offshore include:
- Installation of flowline, umbilicals and associated structures on the seabed
- Pre and post-lay works such as stabilisation materials and seabed surveys
- Subsea infrastructure testing and preservation (discharges)
- 'Flying' our ROV (remotely operated vehicle) close to seabed
- IMR work such as pipeline stabilisation or subsea infrastructure replacement
Impact
- Change in benthic habitat
Risks
- Marine fauna injury or mortality
- Cultural heritage changes
Controls
To mitigate or reduce these impacts and risks we will implement the following controls:
- Planned maintenance system
- Offshore work procedures
- Marine assurance process
- Underwater cultural heritage disturbance risk management process
- Use available seabed survey data to identify and avoid sensitive benthic features and potential underwater cultural heritage
Underwater sound
Underwater sound will be generated from the following activities:
- Work vessel operation: Continuous sound through propeller and thrusters when moving and holding position. Indicative support vessel is shown below.
- Remotely operated Vehicle (ROV) operations
- Sound emissions from geophysical (acoustic) tools
- Seabed sampling
Impact
- Change in ambient sound
Risks
- Behavioural change in marine fauna (marine mammals, marine turtles, fish)
- Auditory (hearing) impairment (marine fauna)
Controls
- Victoria Whale Disturbance Risk Management Procedure to ensure our activities are not inconsistent with relevant EPBC species recovery plans
- Marine Assurance Process
- Offshore Operational Procedures
Greenhouse gas emissions
Greenhouse Gas (GHG) emissions are generated by the following activities:
- Work vessel operations: Work vessels generate direct emissions by their use of diesel or gas to generate power for operation.
Impacts
- Increase in greenhouse gas emissions
- Change in climate systems
- Change in ecosystems
- Change in Socio-economic factors
Controls
- Marine assurance process
Light emissions
Our proposed activities offshore that may result in light emissions include:
- Vessel operations
Impact
- Change in ambient light
Risks
- Change in fauna behaviour
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Conduct a pre-campaign risk review for light
- Implement Marine Assurance Process (e.g. comply with Marine Order 30)
- Implement Light Management Measures (e.g. Vessel non-essential light positioning)
Other atmospheric emissions
Our proposed activities offshore that may result in Atmospheric Emissions include:
- Vessel operations
Impact
- Change in air quality
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Implement a Marine Assurance Process for vessels
Planned discharges
Our proposed activities offshore that may result in planned discharges include:
- Work vessel operations
- Installation of subsea structures
- Subsea infrastructure testing and preservation (discharges)
- Inspection, maintenance and repair (IMR)
Impact
- Change in water quality and change in sediment quality.
Risks
- Injury / mortality to marine fauna.
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Implement a Marine Assurance Process
- Implement an Offshore Chemical Assessment Procedure
- Ensure the vessels meet emissions and discharge standards
- Undertake a campaign risk review
Invasive marine species
Activities
- Ballast water adjustments by support vessels to maintain stability.
- Use of work vessels and subsea equipment (e.g. ROV) which have the potential to attract and transfer IMS.
Risks
- IMS transferred into field, establishes and spreads.
- IMS is transferred between vessels, establishes and spreads to other areas.
- IMS is transferred out of the field and establishes outside the region and spreads.
Controls
- IMS Risk Management Protocol
- Australian Biofouling Management Requirements
Unplanned interactions with marine fauna
Our proposed activities offshore that may result in unplanned interactions with marine fauna include:
- Vessel operations
Risks
- Injury / mortality to marine fauna.
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Implement Offshore Operational Procedures (e.g. distances and management practices for interacting with cetaceans)
- Implement Offshore Victoria Whale Disturbance Risk Management Procedure to ensure our activities are not inconsistent with relevant EPBC species recovery plans
Accidental or uncontrolled hydrocarbon release
Our proposed activities offshore that may result in accidental hydrocarbon release include:
- Work vessel operations
Impact
- Change in water quality
Risks
- Change in habitat
- Change in fauna behaviour
- Injury / Mortality to Fauna
- Changes to the Functions, Interests, or Activities of Other Users
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Implement a Marine Assurance Process (e.g. compliance with Marine Orders)
- Implement Marine Exclusion and Caution Zones
- Undertake ongoing engagement
- Maintain an Operational and Scientific Monitoring Program
- Have an accepted Oil Pollution Emergency Plan for the activity
- Have regulatory Safety Management Plans in place
Loss of Materials or Waste Overboard
Our proposed activities offshore that may result in Loss of Materials or Waste Overboard include:
- Work vessel operations
- ROV operations
Risks
- Change in Habitat
- Injury / Mortality to Marine Fauna
- Change to Cultural Heritage
Controls
To mitigate or reduce the impacts and risks of our activities we will:
- Implement a Marine Assurance Process
- Implement Offshore Operational Procedures
- Ensure Vessels meet Emissions and Discharge standards
Have your say
We want to hear from relevant persons. Please use the contact form below to get in touch, and feel free to share this website link with any other relevant persons that you are aware of.
If you contact us via our webform:
We will consider any relevant matters raised during the development of our EP and respond to you.
What next
We will submit our environment plan to the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for assessment. If you have consulted with us as a relevant person, your input will be considered in improving our EP. Your name will be included in the "sensitive information" part of our plan and not published.
You are being consulted under section 25 of the OPGGS(E) Regulations (Cth).
News
CEO addresses Australian Domestic Gas Outlook Conference
CEO Jane Norman has reinforced that gas remains essential to Australia's energy security and affordability, supporting households, industry and manufacturing while underpinning reliable energy supply.