Basker Manta Gummy (BMG) Closure Project Phase 2 Environment Plan (Update)

Impacts and risks likely of interest for Community groups

Light emissions

Our proposed activities offshore that will result in light emissions include:

  • Vessel operations

Impact

  • Change in ambient light

Risks

  • Change in fauna behaviour

Controls

  • Implement Marine Assurance Process to confirm compliance with Marine Order 30 associated with the prevention of collisions at sea. Given the location of the activity far from any coastlines, and the limited scale and duration of the activity no further measures are planned.

Other atmospheric emissions

Our proposed activities offshore that will result in Atmospheric Emissions include:

  • Vessel operations
  • Helicopter operations

Impact

  • Change in air quality

Controls

  • Implement a Marine Assurance Process for vessels to confirm the vessels compliance with standard emissions management practices required under the International Convention for the Prevention of Pollution from Ships (known as MARPOL).

Planned discharges

Our proposed activities offshore that will result in planned discharges include:

  • Vessel operational discharges as prescribed by MARPOL and local regulations.
  • Movement of subsea structures, flowlines and umbilicals which may displace their contents to sea.

Impact

  • Temporary change in water quality and localised change in sediment quality.

Risks

  • Disturbance and injury to marine fauna.

Controls

  • Implement a Marine Assurance Process for vessels to confirm the vessels compliance with standard emissions management practices required under the International Convention for the Prevention of Pollution from Ships (known as MARPOL).
  • Implement the Amplitude Energy Offshore Chemical Environment Assessment Procedure to ensure chemicals selected for the offshore works do not cause lasting ecological impacts.

Invasive marine species

Activities

  • Ballast water adjustments by construction vessel to maintain stability.
  • Construction vessel operations in Ports and offshore with possible exposure to different invasive marine species.

​​Risks

  • Invasive Marine Species transferred into field, establishes and spreads.
  • Invasive Marine Species transferred into field, establishes and spreads..

Controls

  • Invasive Marine Species Risk Management Protocol to assess and manage the risks associated with the construction vessel.
  • Construction vessel adherence to Australian Biofouling and Ballast Water Management Requirements.

Unplanned interactions with marine fauna

Our proposed activities offshore that have the potential to result in unplanned interactions with marine fauna include:

  • Construction vessel operations

Risks

  • Injury to marine fauna.

Controls

  • Implement Offshore Operational Procedures that ensure the maintenance of distances and management practices for interacting with cetaceans)
  • Implement Offshore Victoria Whale Disturbance Risk Management Procedure to ensure our activities are not inconsistent with relevant EPBC species recovery plans

Accidental or uncontrolled hydrocarbon release

Our proposed activities offshore that have the potential to result in accidental hydrocarbon release include:

  • Construction vessel operations (collision with other marine users).
  • Unplanned release of small quantities of residual hydrocarbons trapped in subsea equipment.

Impact

  • Change in water quality

Risks

  • Change in habitat
  • Change in fauna behaviour
  • Injury to fauna
  • Changes to the functions, interests, or activities of other marine users

Controls

  • Implement a Marine Assurance Process for the vessel to ensure are suitable for the work scope and environmental conditions.
  • Implement Marine Exclusion and Caution Zones to ensure other marine users are aware and can avoid the area.
  • Ongoing consultation and notification with persons who require it.
  • Maintain our capability to respond to a spill of hydrocarbons in accordance with the Oil Pollution Emergency Plan for the activity and associated Operational and Scientific Monitoring Plan.
  • Operate in accordance with NOPSEMA accepted Safety Case(s) for the activity.

Loss of Materials or Waste Overboard

Our activities that have the potential to result in Loss of Materials or Waste Overboard include:

  • Construction vessel operations
  • Subsea activities

Risks

  • Change in habitat
  • Injury to marine fauna
  • Disturbance of cultural heritage

Controls

To mitigate or reduce the impacts and risks of our activities we will implement the following controls:

  • Marine assurance process for the vessels we hire to ensure they are implementing their Waste Management Plan and that it will prevent the unplanned release of wastes to sea.
  • Offshore work procedures to guide the safe recovery of equipment and prevent dropping equipment on the seabed.
  • Monitoring of vessel discharges to ensure the Vessel operational discharges are only as prescribed by MARPOL and local regulations.