News
-
Juliet-1 well intersects high-quality gas-bearing reservoir
Amplitude Energy Limited (AEL: ASX, “Amplitude Energy” or “the Company”) provides the following update on Juliet-1 well drilling operations. Juliet-1 is an exploration well in the Offshore Otway Basin, Victoria, located in permit VIC/L24 within Commonwealth waters, adjacent to the existing Casino, Henry, Netherby (CHN) pipeline.
Amplitude Energy is operator and 50% interest holder in VIC/L24 with O.G. Energy holding the remaining 50% interest. The Juliet-1 8 ½-inch hole section penetrated the primary Waarre C reservoir target and reached a Total Depth (TD) of 2,299 metres TVDSS1 at approximately 22:20 AEST on 7 September 2026, safely and without material incidents.
Preliminary drilling and logging data recorded elevated gas readings in the Waarre C reservoir (intersected at 2,129 metres TVDSS). These gas peaks coincide with elevated resistivity readings observed on Logging While Drilling (LWD) tools, consistent with probable hydrocarbon presence. The Waarre C sandstone exhibits a gross gas-bearing interval of at least 60 metres, which includes 49 metres of interpreted high-quality net pay in line with other Waarre C reservoirs in offset fields.
The gas water contact is currently interpreted as being below TD. Results to date are in-line with pre-drill expectations of reservoir quality and thickness. Other technical information required by ASX Listing Rule 5.30 is provided in the Appendix to this announcement. The Juliet-1 well programme is currently ahead of schedule and budget. Forward plan Wireline logging operations to collect pressure and sample data required to inform resource volume estimates and to determine initial gas composition will be conducted in coming days. Following that a decision to complete Juliet-1 will be made, followed by a clean-up of the well before it is suspended. Information from the clean-up will inform reservoir deliverability and further laboratory analysis will be undertaken to confirm gas composition. These activities are expected to be completed over approximately the next two weeks.
-
CEO addresses Australian Domestic Gas Outlook Conference
CEO Jane Norman has reinforced that gas remains essential to Australia's energy security and affordability, supporting households, industry and manufacturing while underpinning reliable energy supply.
-
Be aware of phishing scam emails
Fraudulent emails that claim to be from an Amplitude Energy email address have recently been arriving in inboxes. These emails look like the real thing, and claim to be from Amplitude employee. They are not from us and are a phishing attempt.
-
East Coast Gas Development- execution of Otway Basin Joint Venture Agreements
A binding interim joint venture agreement with partner O.G. Energy. East Coast Gas Supply Project is targeting supply of up to 90 TJ/d through the existing Athena Gas Plant from 2028, subject to regulatory approvals, final investment decisions and successful execution.
-
Offshore Project Proposal
Offshore Project Proposal is now open for public comment.
-
Investing in Local Economies: How Amplitude Energy is supporting Victoria’s Future
Victoria’s energy landscape is evolving, and at Amplitude Energy, we believe this evolution should benefit every community we serve. Our focus has been on creating economic and social value not only through energy production but also through meaningful partnerships and responsible practices that make a real difference.
-
Introducing Amplitude Energy
With our new company name we launch a new identity and revised vision for our role in Australia’s energy transition. Domestic gas explorer, producer, employer, innovator.